Tuesday, May 19, 2009

and then Brian addresses Laura's issues specially: NRP et al questions

Sent: Tuesday, May 05, 2009 6:27 PM
To: Laura McShane

Subject: FW: NRP et al questions

 

Laura,

 

FYI – see communications below.  Our office had asked about a month ago for the City along with NRP to provide for a one or two page summary of the utility infrastructure issues (current conditions and planned work).

 

I've also cc:ed Tim and Gloria here so they are aware of this further elaboration.

 

Apart from Tim's questions about a few other issues, I know that the infrastructure and historic ravine and stream are a principal concern of yours.

 

My understanding in speaking with Nora, is that there was never an engineered culverting of the old creek/ravine, but that historically the ravine was filled in and then built over, i.e., Fern Court, portions of the tennis courts, etc…  The siting of the new project apparently impinges slightly on areas where the creek and ravine ran, although the design and engineering was done to minimize the placement of the building in these areas.

 

Additionally, as I indicate below, NRP has plans to install a storm water retention system that would hold stormwater run off and control the flow into the City sewer system that runs down Denison Avenue so as not to have an increasing load on the system.  I believe their plans and specs actually lower the stormwater run off loads in terms of peak storms, but Nora and NRP staff have been instructed to provide a summary document that addresses that issue.

 

In any case, please feel free to call or reply back with any other questions you may have and I will ensure that NRP as well as the City Administration are involved in answering concerns.

 

Regards,

 

Brian.

216-333-5453 cell